Neighborhood meeting Thursday, August 6 · Orchard Heights development discussion listed on the agenda.Neighborhood meeting · Thu, Aug 6

See meeting detailsDetails

Save Orchard Heights. Demand a plan that actually fits.

A proposed development across roughly 127 acres would bring as many as about 650 apartments, hundreds of houses, major grading, new and realigned roads, and a possible exchange involving public land.

We’re organizing now to protect Orchard Heights’ wildlife habitat, wetlands and riparian corridors, neighborhood safety, and the public services this scale of growth would depend on.

The Scale Orchard Heights Is Being Asked to Absorb

Nearly 900 Homes, Major Road Changes, and Questions Still Unanswered

~127 acres in the proposed area

The developer exhibit describes 127 acres; the neighborhood minutes refer to approximately 126 acres.

Verified August 3, 2026 · Source documents below

500 apartments shown on Plan 3

Plan 3 expressly labels 500 apartments. Residents don’t accept that figure as an appropriate scale for Orchard Heights.

Verified August 3, 2026 · Source documents below

~650 apartments described as possible

The current proposed plans also suggest approximately 150 apartments could remain possible in the northeast mixed-use area. Neither figure is presented here as acceptable.

Verified August 3, 2026 · Source documents below

342 single-family residential houses shown

Single-family residential house count written on the revised Plan 3 concept.

Verified August 3, 2026 · Source documents below

56 duplexes shown

Duplex count written on the revised Plan 3 concept.

Verified August 3, 2026 · Source documents below

898 total homes shown on Plan 3

The displayed total follows 500 apartments, 342 single-family residential houses and 56 duplexes—but may not include the separately discussed northeastern apartments.

Verified August 3, 2026 · Source documents below

What residents are protecting

Study the Wetlands and Wildlife Before Construction Puts Them at Risk

Residents aren’t asking Salem to ignore the need for housing. We’re asking the City to prove that this scale of construction won’t sacrifice wildlife habitat, wetland and riparian function, neighborhood safety, or essential public services.

The current proposed plans don’t yet provide the field studies, capacity analysis or binding protections needed to answer those concerns.

01

Wildlife habitat

What species use the fields, tree stands, waterways and riparian corridors—and how would grading, roads, lighting and habitat fragmentation affect them?

02

Wetlands and riparian areas

Where are jurisdictional wetlands, seasonal drainage areas and stream buffers? Independent delineation should come before a buildable-acreage claim.

03

Significant trees and open land

Which trees would be removed, what habitat would be lost, and what protections would remain binding after future ownership changes?

04

Road capacity and safety

Can Orchard Heights Road, Grice Hill Road, Islander Avenue and nearby streets safely absorb every phase, including construction traffic?

05

Water, power and sewer

What upgrades are required, who pays for them, and can existing systems support each phase without shifting costs or risk to residents?

06

Schools and emergency response

What school capacity, safe routes, fire flow and emergency-response resources would be required before new homes are occupied?

Independent environmental work needed

Map water, habitat and seasonal conditions before grading plans define what’s “developable.”

Residents need wetland delineation, riparian-buffer mapping, wildlife and habitat surveys, significant-tree inventories, drainage-basin analysis, and a clear explanation of effects on Dahlia Swale and Archer Creek.

Wetland delineation
Riparian buffers
Wildlife surveys
Significant trees
Drainage analysis
Dahlia Swale + Archer Creek

Capacity before construction

Before Construction Begins, Prove the Neighborhood Can Support It

Roads

Can existing streets handle every phase, construction traffic and emergency access without shifting harm onto nearby neighborhoods?

Water, sewer and power

What upgrades are required, what do they cost, and who pays before new demand comes online?

Schools

Which schools would serve the proposal, what capacity exists, and how would students get there safely?

Emergency response

Do fire flow, station coverage and road design support reliable response times at full buildout?

What the buildout would change

Major Construction and More Density Would Change Orchard Heights Forever

The plans describe a phased subdivision, zoning changes, extensive road and utility work, tree removal and preservation, stormwater facilities, mixed-use development, and a possible exchange involving City-owned land.

01

Phased subdivision

Development would occur in phases, reportedly beginning near Islander Avenue.

What residents still need to know

No phase boundaries, dates or approvals are final.

Developer-prepared plans · Verified August 3, 2026

02

Master plan

The current proposed plans describe a master-plan application package.

What residents still need to know

No complete City-accepted application was verified.

Developer-prepared plans · Verified August 3, 2026

03

Zoning changes

Much of the southern RA-zoned land would change to residential zoning; MU-II would be reorganized.

What residents still need to know

Final boundaries and approval requests remain unverified.

Developer-prepared plans · Verified August 3, 2026

04

Apartments & mixed use

Plan 3 shows 500 apartments and the current proposed plans discuss approximately 150 more as possible.

What residents still need to know

The apartment total isn’t reconciled.

Developer-prepared plans · Verified August 3, 2026

05

Single-family residential housing

Plan 3 labels 342 single-family residential houses on lots the developer describes as roughly 5,000–6,000 square feet.

What residents still need to know

Lot sizes and unit forms are not binding.

Developer-prepared plans · Verified August 3, 2026

06

Duplexes

Plan 3 labels 56 duplexes described as attached middle housing.

What residents still need to know

Ownership, garages and yards are expectations, not guarantees.

Developer-prepared plans · Verified August 3, 2026

07

Road network

Orchard Heights Road, Grice Hill Road, collector routes and internal streets could change.

What residents still need to know

No completed traffic-impact analysis was supplied.

Developer-prepared plans · Verified August 3, 2026

08

Trees & open space

Exhibits identify significant trees, park ideas and open-space areas.

What residents still need to know

Removal counts and binding protections are not documented.

Developer-prepared plans · Verified August 3, 2026

09

Stormwater & utilities

Detention, water-quality facilities and utility extensions are discussed.

What residents still need to know

Locations, capacity, funding and maintenance remain unclear.

Developer-prepared plans · Verified August 3, 2026

10

Commercial potential

The current proposed plans mention a possible small commercial center near the northeast corner.

What residents still need to know

No final commercial layout or commitment exists.

Developer-prepared plans · Verified August 3, 2026

11

Potential City land trade

A possible exchange involving City property north of Orchard Heights Road is described.

What residents still need to know

Parcels, values, terms and approvals are not documented.

Developer-prepared plans · Verified August 3, 2026

A Scale the Neighborhood Can’t Support

The Count Is Unclear—and Even the Lower Figure Would Overwhelm Orchard Heights

The revised plan drawing shows 500 apartments. The current proposed plans also state that approximately 150 more apartments could remain possible in the northeast mixed-use area—potentially bringing the total to about 650. The materials don’t explain whether those units are included in or additional to the 898-home Plan 3 total. That uncertainty matters, but residents’ objection is more fundamental: even the 500 apartments shown would bring a level of density and infrastructure demand this small, quiet neighborhood can’t support.

The developer’s unresolved math

The Developer Still Hasn’t Reconciled Its Apartment Count

Developer’s Plan 3 figure

500

Additional northeast figure

150

Possible developer total

650

Developer’s stated Plan 3 total

500 apartments+342 single-family residential houses+56 duplexes=898 homes shown

If the additional 150 apartments sit outside that total, the project would reach 1,048 homes. The materials don’t say whether they’re additional or already included.

Resident position

Clarifying the count doesn’t make the scale acceptable.

The addition of 500 apartments would overwhelm roads, utilities, schools, emergency response and the quiet residential character of Orchard Heights. The developer’s numbers are shown so the public can challenge them—not as an endorsement.

Questions Salem must answer before accepting development at this scale

  • Is 500 only the western apartment count—and could the developer’s proposal reach roughly 650 apartments?
  • Can Orchard Heights’ roads, water systems, schools, utilities and emergency services even support the 500 apartments shown?
  • Why should impact studies proceed before the developer states one complete unit count?
  • Will Salem require a smaller proposal if independent studies show this scale can’t be supported?
  • Which complete buildout figure will traffic, school, water, sewer and emergency-response studies analyze?
Get Development Alerts

Land and zoning

From Quiet Living to Traffic, Noise, and a Major Urban Buildout

The developer’s aerial exhibit shows substantial areas of open or cultivated land. The zoning exhibit labels the northern portion Mixed Use-II and the southern portion Residential Agriculture. The concept would reorganize mixed-use zoning and convert much of the southern land to residential development.

Developer-provided zoning exhibit showing MU-II across the north and Residential Agriculture across the south, with legend visible. Not an approval.
Developer-provided zoning exhibit. Legend preserved; not an authoritative City GIS layer.

Today

  • Open or cultivated land
  • Existing homes and trees
  • MU-II in the north
  • RA in the south

Proposed direction

  • Residential rezoning
  • Relocated mixed-use area
  • Apartments, houses and duplexes
  • Roads, parks and stormwater facilities

Needs documentation

  • Final zoning boundaries
  • Final developable acreage
  • Binding open-space protections
  • Final units, heights and phases

Commercial Zoning Would Reach Into Residential Life

More Deliveries, More Cars, Later Hours—What Will Protect Nearby Homes?

The current proposed plans show 500 apartments and discuss roughly 150 more as possible—a scale that is fundamentally incompatible with this small, quiet neighborhood. Mixed-use zoning would add commercial traffic, parking, noise, lighting and late-hour activity alongside the substantial increase in residential traffic and demand. Clear limits are necessary, but mitigation doesn’t answer the larger question of whether development this substantial belongs here at all.

Delivery traffic

Box trucks, service vehicles and loading activity would add frequent commercial trips near homes. Plans should identify delivery routes, loading areas and enforceable delivery hours.

Parking demand

Customer, employee and resident parking would spill onto nearby streets. A complete plan should show realistic demand, on-site capacity and protections for neighborhood parking.

Noise pollution

Loading, refuse collection, mechanical equipment, alarms and added traffic would change the area’s sound environment. Noise limits and mitigation should be defined before approval.

Light pollution

Parking lots, signs, storefronts and security lighting would introduce glare after dark. Residents need photometric plans, shielding standards and clear operating-hour limits.

Vehicle congestion

Commercial access points and turning movements would compound residential traffic. Analysis should address queues, intersections and the full buildout—not only an early phase.

Late-hour activity

Customers, employees, deliveries and waste collection would extend activity into evenings or early mornings. Permitted hours and enforcement expectations should be public and binding.

Roads and traffic

More Homes Mean More Cars—Where Is the Full Traffic Plan?

The current proposed plans contemplate reconstruction or realignment of Orchard Heights Road, a Grice Hill Road connection, several collector routes and new internal streets. Residents need an independent traffic analysis based on the full buildout—not assumptions selected to make one phase appear manageable.

Developer-prepared road concept showing possible Orchard Heights Road and Grice Hill Road realignment. Not an approved transportation plan.
Developer illustration of a possible road alignment. Not an approved transportation plan.

Development traffic

What unit count will the analysis assume, and how many daily and peak-hour trips would each phase generate?

Existing streets

How would Islander Avenue, 35th Avenue, Grice Hill Road and nearby residential streets be affected?

Walking and cycling

How would residents cross collector or arterial streets, and what safe connections would be built?

Construction

Where would trucks travel, how long would road work last, and how would access be maintained?

Public cost

Which improvements would be developer-funded, and which would become City obligations?

Emergency response

Would road changes improve or delay fire, medical and police access?

Public land

Public Land Shouldn’t Change Hands Before the Public Sees the Deal

The current proposed plans discuss a potential exchange involving City-owned property north of Orchard Heights Road near the BPA corridor. The exact land, values, restrictions, obligations and approval process haven’t been documented in the materials residents received. The public should see the complete terms before Salem makes a commitment.

Resident position

Keep Public Land Public—No Trade for a Larger Private Buildout

  1. 01

    Define the land

    Publish exact parcels, acreage, ownership, easements and legal descriptions.

  2. 02

    Value it independently

    Release current appraisals that account for zoning, access, topography and development constraints.

  3. 03

    Show both benefits

    Explain what the public receives—and what private development gains from the exchange.

  4. 04

    Decide in public

    Identify the hearings, votes, notice, review criteria and appeal rights before any commitment.

What land would change hands?

  • Parcel numbers and legal descriptions
  • Maps and acreage
  • Current and proposed ownership
  • Zoning, easements and access constraints

What is each parcel worth?

  • Independent appraisals
  • Dates and comparable sales
  • Zoning and rezoning assumptions
  • Topographic, utility and environmental constraints

What would the public receive?

  • Public park acreage and access
  • Trail and recreation commitments
  • Tree and habitat protection
  • Construction and long-term maintenance funding

What would private development receive?

  • Developable acreage and road access
  • Zoning advantages
  • Stormwater flexibility
  • Changes in unit capacity or constraints

Who decides?

  • Planning and parks review
  • City Council or commission roles
  • Public hearings and notice
  • Appeal rights and required votes

What’s verified

Salem Can’t Judge What the Developer Hasn’t Fully Documented

A developer’s plan can show what’s being considered. It can’t substitute for accepted applications, independent studies, binding conditions or a public decision.

City records

Officially established

01Our Salem zoning changes adopted in 2022

02Current zoning lookup tools

03Separate 2916 Orchard Heights decision

Developer-prepared

Shown in current plans

01Approximately 127-acre site

02Plan 1 capacity comparison

03Plan 3 revised concept

04500 apartments drawn

05342 single-family residential houses

0656 duplexes

07Road and zoning concepts

08Potential land trade and small commercial center

Neighborhood record

Raised in meetings

01Resident concerns

02Approximate timing estimates

03Initial phase of approximately 50 lots

04School, water and utility discussion

Before major decisions

Still required

01Reconciled unit count

02Complete application

03Building heights and bedroom mix

04Traffic and drainage studies

05School and utility capacity

06Tree-removal inventory

07Binding open-space plan

08Land-trade parcels and appraisals

09Infrastructure cost allocation

10Formal review schedule and deadlines

The Minimum Salem Should Require

Independent Studies Before Irreversible Decisions

Salem should require traffic, drainage, habitat, and infrastructure studies conducted independently of the developer and available for full public review.

Complete record

Plans, unit counts, phases and land-trade terms that agree with one another.

Independent proof

Traffic, drainage, habitat and infrastructure studies residents can examine.

Public accountability

Clear criteria, binding commitments and enough time for meaningful review.

Who to contact

Demand Clear Written Answers From the People Shaping This Proposal

Residents can direct questions to Ward 8’s elected representative and the developer’s planning consultant. Ask about the proposal’s scale, traffic, infrastructure, wetlands, wildlife, public land and review schedule.

How we got here

The Proposal Is Moving—Residents Need to Act Before Decisions Harden

  1. 2009
    Developer exhibit

    Earlier Orchard Heights Road concept

    The developer narrative says the property owner previously proposed relocating Orchard Heights Road for construction purposes. The current materials argue that the earlier alignment did not account for the later design.

  2. July 2022
    Official record

    Our Salem zoning changes adopted

    The City adopted changes to the Comprehensive Plan, zoning map and zoning code. The official record says only the northern half of specified Orchard Heights properties was rezoned MU-II.

  3. April 2024
    Official record

    Separate 2916 Orchard Heights project approved

    A separate 186-unit multifamily development was approved. The materials reviewed don’t establish that it’s part of the developer’s current Orchard Heights proposal.

  4. June 4, 2025
    Developer exhibit

    Date printed on developer narrative

    The uploaded packet’s first page bears this date and describes Plan 1, Plan 3, zoning, roads, parks, stormwater and a potential City land trade.

  5. June 4, 2026
    Meeting summary

    Orchard Heights proposal discussed with WSNA

    Meeting minutes summarize the developer’s presentation concerning approximately 126 acres, apartments, subdivision phases, roads, parks, stormwater, schools and a possible land trade.

  6. August 6, 2026
    Meeting summary

    Follow-up neighborhood discussion listed

    The WSNA agenda lists the developer’s Cherry Hill subdivision presentation under new business. This isn’t a formal land-use hearing.

  7. Later 2026 / early 2027
    Meeting summary

    Possible future filings

    The presenter reportedly estimated transportation material in two to four months and subdivision plans in six to eight months. These are estimates, not filing deadlines.

Take action

Speak Up Before the Plan Becomes Harder to Change

The most effective time to demand evidence and safeguards is before the proposal becomes difficult to change.

1

Stay informed

Receive concise alerts when plans, studies, notices, meetings, deadlines and decisions become available.

Join the email list
2

Review the evidence

Read the developer exhibits, review the revised Plan 3, and see which questions remain unanswered.

View the source documents
3

Show up

Attend neighborhood meetings and future hearings. Ask specific questions and request that answers enter the record.

Get meeting alerts
4

Comment effectively

When a formal application opens, address applicable approval criteria with documented evidence—not rumors or personal attacks.

Learn how public comment works

Before Salem advances the proposal

Promises Can Change. Orchard Heights Needs Six Commitments in Writing.

These are minimum requirements, not acceptance of 500 apartments or development at this scale. Residents believe the proposal is too large for this quiet neighborhood and want Salem to address that fundamental concern before it advances.

01

One defensible unit count

Reconcile the 500, ~650 and 898 figures before impact studies rely on them.

02

Traffic and drainage studies

Publish assumptions, downstream effects, mitigations and phase-by-phase impacts.

03

Infrastructure capacity

Show how roads, water, power, sewer, schools and emergency response will keep pace.

04

Habitat and water protection

Document wetlands, riparian corridors, wildlife habitat, significant trees and binding buffers.

05

Complete land-trade terms

Release parcel maps, appraisals, restrictions, public benefits and private development gains.

06

Binding open-space commitments

Separate usable public space from stormwater infrastructure and protect it long term.

Frequently asked questions

Before Salem Moves Forward, Residents Deserve Clear Answers

What the Developer Submitted to Residents

Read the Plans That Would Reshape Orchard Heights

The developer calls this proposal “Cherry Hill.” These are developer-prepared meeting exhibits, not City-approved plans. Full-page scans preserve handwritten annotations, legends, dates and surrounding context.