Were you at the August 6 meeting? Get the next Orchard Heights update as soon as new information is available.Meeting materials and updates

Get updatesUpdates

Save Orchard Heights. Demand a plan that actually fits.

A proposed development across 127 acres would bring up to 500 apartments, 320 houses, 110 duplexes, major road reconstruction, and a possible exchange involving public land. The consultant lowered the headline count. The scale is still wrong for Orchard Heights.

We’re organizing now to protect Orchard Heights’ wildlife habitat, wetlands and riparian corridors, neighborhood safety, and the public services this scale of growth would depend on.

See the Plans

The Scale Orchard Heights Is Being Asked to Absorb

Nearly 900 Homes, Major Road Changes, and Questions Still Unanswered

127 acres in the proposed area

That's nearly every open acre left in Orchard Heights — fields, tree stands and waterways that can never be restored once grading begins.

~500 apartments possible under requested zoning

Plan 4 says 300. The zoning allows 500. The number residents should plan for is the one the consultant's zoning would legally permit — not the one in the sales pitch.

930 homes at maximum allowed density

The consultant presents 730 homes as the plan. But the zoning they're requesting could legally support 930. The lower number gets the approval. The higher number gets built.

320 single-family houses shown

Three hundred twenty houses on top of hundreds of apartments means well over a thousand new households competing for the same narrow roads and limited services.

110 attached duplex units shown

The consultant doubled the duplex count from 56 to 110 between plans. If density keeps climbing with each revision, what number will residents actually get?

930 homes possible under Plan 4 zoning

Nine hundred thirty homes on 127 acres would permanently transform Orchard Heights from a quiet residential neighborhood into a dense urban district — with no proof the infrastructure can handle it.

What residents are protecting

Study the Wetlands and Wildlife Before Construction Puts Them at Risk

Residents aren’t asking Salem to ignore the need for housing. We’re asking the City to prove that this scale of construction won’t sacrifice wildlife habitat, wetland and riparian function, neighborhood safety, or essential public services.

The current proposed plans don’t yet provide the field studies, capacity analysis or binding protections needed to answer those concerns.

01

Wildlife habitat

What species use the fields, tree stands, waterways and riparian corridors—and how would grading, roads, lighting and habitat fragmentation affect them?

02

Wetlands and riparian areas

Where are jurisdictional wetlands, seasonal drainage areas and stream buffers? Independent delineation should come before a buildable-acreage claim.

03

Significant trees and open land

Which trees would be removed, what habitat would be lost, and what protections would remain binding after future ownership changes?

04

Road capacity and safety

Can Orchard Heights Road, Grice Hill Road, Islander Avenue and nearby streets safely absorb every phase, including construction traffic?

05

Water, power and sewer

What upgrades are required, who pays for them, and can existing systems support each phase without shifting costs or risk to residents?

06

Schools and emergency response

What school capacity, safe routes, fire flow and emergency-response resources would be required before new homes are occupied?

Independent environmental work needed

Map water, habitat and seasonal conditions before grading plans define what’s “developable.”

Residents need wetland delineation, riparian-buffer mapping, wildlife and habitat surveys, significant-tree inventories, drainage-basin analysis, and a clear explanation of effects on Dahlia Swale and Archer Creek.

Wetland delineation
Riparian buffers
Wildlife surveys
Significant trees
Drainage analysis
Dahlia Swale + Archer Creek

Capacity before construction

Before Construction Begins, Prove the Neighborhood Can Support It

Roads

Can existing streets handle every phase, construction traffic and emergency access without shifting harm onto nearby neighborhoods?

Water, sewer and power

What upgrades are required, what do they cost, and who pays before new demand comes online?

Schools

Which schools would serve the proposal, what capacity exists, and how would students get there safely?

Emergency response

Do fire flow, station coverage and road design support reliable response times at full buildout?

What the buildout would change

Major Construction and More Density Would Change Orchard Heights Forever

The plans describe a phased subdivision, zoning changes, extensive road and utility work, tree removal and preservation, stormwater facilities, mixed-use development, and a possible exchange involving City-owned land.

01

Phased subdivision

Development would occur in phases, reportedly beginning near Islander Avenue.

What's missing

Without finalized phases, the consultant can change what gets built where and when — and residents have no enforceable schedule to hold them to.

02

Master plan

The current proposed plans describe a master-plan application package.

What's missing

No complete application has been accepted by the City. Until one is filed, there are no binding conditions, no public comment period and no enforceable commitments.

03

Zoning changes

Much of the southern RA-zoned land would change to residential zoning; MU-II would be reorganized.

What's missing

Rezoning is the point of no return. No final boundaries or approval requests have been filed — but once they are, the farmland zoning that protects this land today could be erased.

04

Apartments & mixed use

Plan 4 presents 300 apartments at minimum density, but the requested zoning allows up to 500 on the same land. The consultant now frames these as possible ‘senior housing.’

What's missing

Calling it ‘senior housing’ doesn’t change the zoning, the density or the infrastructure load. The consultant is requesting the same MU-II designation that allows 25 units per acre — with no binding commitment to build for seniors.

05

Single-family residential housing

Plan 4 shows 320 single-family houses on lots the consultant describes as roughly 5,000 to 6,000 square feet.

What's missing

The consultant dropped the house count from 342 to 320 but increased duplexes from 56 to 110. The total footprint barely changed — it just shifted to higher density. And lot sizes still aren’t binding.

06

Duplexes

The duplex count nearly doubled from 56 to 110 between Plan 3 and Plan 4. Each pair occupies a separate lot described as owner-occupied with garages.

What's missing

Doubling the duplex count from 56 to 110 adds 54 more households to roads and utilities that haven’t been studied for the original number. The consultant’s promise of owner-occupied units with garages is marketing, not a legal commitment.

07

Road network

The consultant’s revised road plan reroutes collector traffic through Islander Avenue to Titan Drive, adds a new collector to 32nd Avenue, and keeps Orchard Heights Road in place. Stantec Engineering is preparing grading plans.

What's missing

Swapping 35th Avenue for Islander Avenue as a collector doesn’t solve the fundamental problem: no traffic study has been completed. Residents are being asked to accept a road network drawn by the consultant’s team, for the consultant’s benefit, without independent verification.

08

Trees & open space

The consultant labels 15.63 acres as a public park and identifies significant trees on the topo survey. But the ‘private park’ only exists if the City refuses the land trade — meaning the consultant controls whether residents get public or private green space.

What's missing

A 15-acre park sounds generous until you realize it’s contingent on a land trade the public hasn’t approved. If the trade goes through, residents could end up with less. And ‘significant trees marked’ isn’t the same as ‘significant trees protected.’

09

Stormwater & utilities

The revised plan allocates 6.52 acres for stormwater but also proposes removing an existing wetland to build a detention pond — trading a natural water system for an engineered one.

What's missing

The consultant proposes removing a wetland to build a detention pond. Destroying a natural drainage system to engineer a replacement raises serious environmental questions — and no independent review has evaluated whether the trade-off is sound.

10

Commercial potential

The current proposed plans mention a possible small commercial center near the northeast corner.

What's missing

A ‘possible commercial center’ could mean anything from a small café to a strip mall with delivery trucks and late-night hours. No plan, no traffic estimate and no noise study has been provided.

11

Potential City land trade

A possible exchange involving City property north of Orchard Heights Road is described.

What's missing

Residents own this land through the City. Trading it away without transparent valuations, public hearings and documented terms would be an accountability failure.

12

Schools & emergency services

The development could add hundreds of school-age children and nearly double emergency call volume in the area.

What's missing

No school-capacity study has been produced, and no agreement exists with the district on funding, siting or timing for new facilities. Families could arrive before classrooms exist.

13

Senior housing designation

The consultant now frames the MU-II apartment zones as potential 'senior housing' — a label that appeared for the first time in the August 2026 revision.

What's missing

'Senior housing' isn't a zoning category in Salem. It's a label the consultant chose. MU-II zoning allows apartments of any kind, for any age group, at any density up to 25 units per acre. The label could disappear the moment the zoning is approved.

14

Construction timeline & disruption

A project of this scale could mean years of heavy equipment, truck traffic, dust, noise, and road closures through a neighborhood with one main road in and out.

What's missing

No phasing schedule, haul-route plan, or construction-hours commitment has been provided. Residents deserve to know how long disruption would last and what protections would be in place before anything is approved.

Who to contact

Demand Clear Written Answers From the People Shaping This Proposal

Residents can direct questions to Ward 8’s elected representative and the project’s planning consultant. Ask about the proposal’s scale, traffic, infrastructure, wetlands, wildlife, public land and review schedule.

A Scale the Neighborhood Can't Support

The Consultant Lowered the Headline. The Zoning Still Allows 930 Homes.

The consultant’s revised Plan 4 presents 730 homes as the new target — 320 houses, 110 duplexes and 300 apartments at 15 units per acre. But the zoning they’re requesting allows up to 25 units per acre, which would push the apartment count to 500 and the total to 930. The consultant lowered the headline number from 898 to 730, but the zoning hasn’t changed. Nothing prevents the density from climbing right back up after approval. And residents’ objection is more fundamental: Orchard Heights cannot support even the reduced figure, and the neighborhood opposes any number of apartments on this land.

The consultant's density range

300 Apartments Is the Pitch. 500 Is What the Zoning Allows.

Consultant's Plan 4 figure

300

at 15 units/ac

Consultant's stated maximum

500

at 25 units/ac

Plan 4 stated total

300 apartments+320 houses+110 duplexes=730 homes stated

The consultant's own narrative states a maximum density of 25 units per acre. At that density, the apartment areas produce 500 units — not 300 — pushing the total to 930. The zoning doesn't lock in the lower number.

Resident position

Clarifying the count doesn't make the scale acceptable.

Whether it's 300 apartments or 500, the result is the same: a neighborhood that was never designed for this density gets permanently transformed. Residents oppose apartments on this land at any number the consultant has presented.

Questions Salem must answer before accepting development at this scale

  • If the zoning allows 25 units per acre, what stops the consultant from building 500 apartments after approval — regardless of what Plan 4 presents today?
  • Can Orchard Heights’ roads, water, schools, utilities and emergency services support even 300 apartments — let alone the 500 the zoning would allow?
  • Why has no independent impact study been completed for a project that could add 930 homes to a single neighborhood?
  • Will Salem require a smaller proposal if independent studies show this scale can’t be supported?
  • Has the consultant demonstrated that the proposed road network can handle emergency evacuation from up to 930 homes?
  • What binding environmental protections will be in place before grading begins—and who enforces them?

Land and zoning

From Quiet Living to Traffic, Noise, and a Major Urban Buildout

The consultant’s aerial exhibit shows substantial areas of open or cultivated land. The zoning exhibit labels the northern portion Mixed Use-II and the southern portion Residential Agriculture. The concept would reorganize mixed-use zoning and convert much of the southern land to residential development.

Consultant-provided zoning exhibit showing MU-II across the north and Residential Agriculture across the south, with legend visible. Not an approval.
Consultant-provided zoning exhibit. Legend preserved; not an authoritative City GIS layer.

Today

  • Open or cultivated land
  • Existing homes and trees
  • MU-II in the north
  • RA in the south

Proposed direction

  • Residential rezoning
  • Relocated mixed-use area
  • Apartments, houses and duplexes
  • Roads, parks and stormwater facilities

Needs documentation

  • Final zoning boundaries
  • Final developable acreage
  • Binding open-space protections
  • Final units, heights and phases

Commercial Zoning Would Reach Into Residential Life

More Deliveries, More Cars, Later Hours—What Will Protect Nearby Homes?

The current proposed plans show 500 apartments and discuss roughly 150 more as possible—a scale that is fundamentally incompatible with this small, quiet neighborhood. Mixed-use zoning would add commercial traffic, parking, noise, lighting and late-hour activity alongside the substantial increase in residential traffic and demand. Clear limits are necessary, but mitigation doesn’t answer the larger question of whether development this substantial belongs here at all.

Delivery traffic

Box trucks, service vehicles and loading activity would add frequent commercial trips near homes. Plans should identify delivery routes, loading areas and enforceable delivery hours.

Parking demand

Customer, employee and resident parking would spill onto nearby streets. A complete plan should show realistic demand, on-site capacity and protections for neighborhood parking.

Noise pollution

Loading, refuse collection, mechanical equipment, alarms and added traffic would change the area’s sound environment. Noise limits and mitigation should be defined before approval.

Light pollution

Parking lots, signs, storefronts and security lighting would introduce glare after dark. Residents need photometric plans, shielding standards and clear operating-hour limits.

Vehicle congestion

Commercial access points and turning movements would compound residential traffic. Analysis should address queues, intersections and the full buildout—not only an early phase.

Late-hour activity

Customers, employees, deliveries and waste collection would extend activity into evenings or early mornings. Permitted hours and enforcement expectations should be public and binding.

Roads and traffic

More Homes Mean More Cars—Where Is the Full Traffic Plan?

The current proposed plans contemplate reconstruction or realignment of Orchard Heights Road, a Grice Hill Road connection, several collector routes and new internal streets. Residents need an independent traffic analysis based on the full buildout—not assumptions selected to make one phase appear manageable.

Consultant-prepared Plan 4 showing 375 lots, parks, senior housing zones, collector streets and stormwater detention. Not an approved plan.
Plan 4 subdivision layout showing collector streets, parks and housing zones. Not an approved plan.

Development traffic

Will the traffic analysis model the full 930-home buildout, or just the 730-home figure the consultant is presenting? Peak-hour trip counts determine whether intersections fail — the baseline number matters.

Existing streets

How would Islander Avenue handle collector-street traffic to Titan Drive? What happens to 32nd Avenue if a new collector cuts through? And have residents on these streets been consulted?

Walking and cycling

How would residents cross collector or arterial streets, and what safe connections would be built?

Construction

Where would trucks travel, how long would road work last, and how would access be maintained?

Public cost

Which improvements would be consultant-funded, and which would become City obligations?

Emergency response

Would road changes improve or delay fire, medical and police access?

Public land

Public Land Belongs to the People of Salem — Not to a Consultant’s Expansion Plan

The current proposed plans discuss a potential exchange involving City-owned property north of Orchard Heights Road near the BPA corridor. The exact values, restrictions, obligations and approval process haven’t been documented in the materials residents received.

Resident position

Keep Public Land Public—No Trade for a Larger Private Buildout

  1. 01

    Define the land

    Publish exact parcels, acreage, ownership, easements and legal descriptions.

  2. 02

    Value it independently

    Release current appraisals that account for zoning, access, topography and development constraints.

  3. 03

    Show both benefits

    Explain what the public receives—and what private development gains from the exchange.

  4. 04

    Decide in public

    Identify the hearings, votes, notice, review criteria and appeal rights before any commitment.

What land would change hands?

  • Parcel numbers and legal descriptions
  • Maps and acreage
  • Current and proposed ownership
  • Zoning, easements and access constraints

What is each parcel worth?

  • Independent appraisals
  • Dates and comparable sales
  • Zoning and rezoning assumptions
  • Topographic, utility and environmental constraints

What would the public receive?

  • Public park acreage and access
  • Trail and recreation commitments
  • Tree and habitat protection
  • Construction and long-term maintenance funding

What would private development receive?

  • Developable acreage and road access
  • Zoning advantages
  • Stormwater flexibility
  • Changes in unit capacity or constraints

Who decides?

  • Planning and parks review
  • City Council or commission roles
  • Public hearings and notice
  • Appeal rights and required votes

What’s verified

Salem Can’t Judge What the Consultant Hasn’t Fully Documented

A consultant’s plan can show what’s being considered. It can’t substitute for accepted applications, independent studies, binding conditions or a public decision.

City records

Officially established

01Our Salem zoning changes adopted in 2022

02Current zoning lookup tools

03Separate 2916 Orchard Heights decision

Consultant-prepared

Shown in current plans

01Approximately 127-acre site

02Plan 1 capacity comparison

03Plan 3 revised concept

04Plan 4 current proposal

05300-500 apartments depending on density

06320 single-family residential houses

07110 attached duplexes

08Senior housing designation

09Road and zoning concepts

10Potential land trade and small commercial center

Neighborhood record

Raised in meetings

01Resident concerns

02Approximate timing estimates

03Initial phase of approximately 50 lots

04School, water and utility discussion

Before major decisions

Still required

01Reconciled unit count

02Complete application

03Building heights and bedroom mix

04Traffic and drainage studies

05School and utility capacity

06Tree-removal inventory

07Binding open-space plan

08Land-trade parcels and appraisals

09Infrastructure cost allocation

10Formal review schedule and deadlines

The Minimum Salem Should Require

Independent Studies Before Irreversible Decisions

Salem should require traffic, drainage, habitat, and infrastructure studies conducted independently of the consultant and available for full public review.

Complete record

Plans, unit counts, phases and land-trade terms that agree with one another.

Independent proof

Traffic, drainage, habitat and infrastructure studies residents can examine.

Public accountability

Clear criteria, binding commitments and enough time for meaningful review.

Take action

Speak Up Before the Plan Becomes Harder to Change

The most effective time to demand evidence and safeguards is before the proposal becomes difficult to change.

1

Stay informed

Receive concise alerts when plans, studies, notices, meetings, deadlines and decisions become available.

Join the email list
2

Review the evidence

Read the consultant exhibits, review Plan 4 and the earlier Plan 3, and see which questions remain unanswered.

View the source documents
3

Show up

Attend neighborhood meetings and future hearings. Ask specific questions and request that answers enter the record.

Get meeting alerts
4

Comment effectively

When a formal application opens, address applicable approval criteria with documented evidence—not rumors or personal attacks.

Learn how public comment works

Before Salem advances the proposal

Promises Can Change. Orchard Heights Needs Six Commitments in Writing.

These are minimum requirements, not acceptance of 500 apartments or development at this scale. Residents believe the proposal is too large for this quiet neighborhood and want Salem to address that fundamental concern before it advances.

01

One defensible unit count

Reconcile the 500, ~650 and 898 figures before impact studies rely on them.

02

Traffic and drainage studies

Publish assumptions, downstream effects, mitigations and phase-by-phase impacts.

03

Infrastructure capacity

Show how roads, water, power, sewer, schools and emergency response will keep pace.

04

Habitat and water protection

Document wetlands, riparian corridors, wildlife habitat, significant trees and binding buffers.

05

Complete land-trade terms

Release parcel maps, appraisals, restrictions, public benefits and private development gains.

06

Binding open-space commitments

Separate usable public space from stormwater infrastructure and protect it long term.

Frequently asked questions

Before Salem Moves Forward, Residents Deserve Clear Answers

What the Consultant Submitted to Residents

Read the Plans That Would Reshape Orchard Heights

The consultant calls this proposal “Cherry Hill.” These are consultant-prepared meeting exhibits, not City-approved plans. Full-page scans preserve handwritten annotations, legends, dates and surrounding context.

Download Plan 4 Exhibits